PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Underground roughing for sanitary sewer by Elev. 1,2,3 Facing South (800x600).jpg Underground storm piping along column line 2.5 Facing South-East (800x600).jpg Backfilling underground roughing along column line 2.5 between G-K Facing East (800x600).jpg Electricicans working on the underground piping by the bridge Facing Cherry Street (800x600).jpg Placed 3-4 gravel inside Stair -5 pit Facing West (800x600).jpg Started installing metal decking at Derrick -3 (3rd Floor) fromcolumn lines H-M to 4-6 Facing North (800x600).jpg Temporary stairs Facing South (800x600).jpg